Anacostia System
From R3levees
| Anacostia System | |
|---|---|
| Owned by: | unknown |
| Maintained by: | unknown |
| FIRM protection provided: | yes |
| Level of protection: | 100-500 year flood |
| Certification status: | Pre-PAL |
| Preliminary PAL scenario: | E |
| Final PAL scenario: | C1 |
| Rating description: | unknown |
| Part of: | Washington, DC Project |
| Hydraulic segment(s): | |
Anacostia System Hydraulic Segments
| New Segment: |
|
The Anacostia System belongs to the Washington, DC Project and has the following component hydraulic segments: .
Correspondence
Public Meetings
Media
Maps
- Anacostia System Map
- FIRM Panel 1100010076C (no date)
- FIRM Panel 1100010057C (no date)
- FIS - Washington, D.C. (November 15, 1985)
- Washington, DC USACE Flood Control Map (1990)
Facts about Anacostia System
| Certification status | Pre-PAL + |
| FIRM protection provided | yes + |
| Final PAL scenario | C1 + |
| Level of protection | 100-500 year flood + |
| Maintained by | Unknown + |
| Owned by | Unknown + |
| Part of | Washington, DC Project + |
| Preliminary PAL scenario | E + |
| Rating description | unknown + |