District of Columbia System
From R3levees
| District of Columbia System | |
|---|---|
| Owned by: | unknown |
| Maintained by: | unknown |
| FIRM protection provided: | unknown |
| Level of protection: | 100-500 year flood |
| Certification status: | Pre-PAL |
| Preliminary PAL scenario: | C |
| Final PAL scenario: | C1 |
| Rating description: | Excellent (ICW) |
| Part of: | Washington, DC Project |
| Hydraulic segment(s): | District of Columbia Segment |
The District of Columbia System belongs to the Washington, DC Project and is comprised of: District of Columbia Segment.
PAL Process Milestones
| PAL workflow event: |
|
| Event | Effective date | PAL milestone | Document |
|---|---|---|---|
| NCPC Presentation | 1202360400February 7, 2008 | Community Meeting |
Correspondence
- Final NCPC Flood Report (February, 2007)
- National Capital Planning Commission Memo to the DC Department of the Environment
- LFD Postponement Memo (January 11, 2008)
- LFD Postponement Response Memo (January 11, 2008)
Public Meetings
Media
- Flood Zone Change in D.C. Could Be Costly -- Washington Post, January 7, 2008
- District Appeals Widening Of Downtown Flood Zone -- Washington Post, January 24, 2008
Maps
Facts about District of Columbia System
| Certification status | Pre-PAL + |
| FIRM protection provided | unknown + |
| Final PAL scenario | C1 + |
| Has part | District of Columbia Segment + |
| Level of protection | 100-500 year flood + |
| Maintained by | Unknown + |
| Owned by | Unknown + |
| Part of | Washington, DC Project + |
| Preliminary PAL scenario | C + |
| Rating description | Excellent (ICW) + |

